Before the floor finish goes down: slab preparation on commercial projects
When a commercial floor finish fails, the finish is usually blamed first. More often, the cause is the slab underneath. Moisture, flatness and surface condition all decide whether vinyl, carpet tiles, epoxy, timber or tiles will perform as intended.
Moisture in the slab
New concrete releases moisture for a long time as it dries. If a finish or adhesive is laid before the slab is dry enough, that moisture can cause bubbling, lifting, adhesive breakdown and odours. Each flooring manufacturer sets its own moisture limits and test methods, and those limits decide when the finish can go down.
- Is moisture testing included in the program, using the method the finish manufacturer requires?
- Was a vapour barrier specified and installed under the slab?
- If the slab is too wet, is a moisture mitigation system allowed for in time and cost?
Flatness and level
Thin finishes show every hollow and ridge. The specified flatness and level tolerances for the slab should match what the finish needs. Where they do not, grinding or levelling compounds are needed, and both take time.
Surface condition
Curing compounds, laitance, paint, plaster and other contaminants can stop adhesives and coatings from bonding. Surfaces are normally ground or blasted, cleaned and primed to suit the finish system.
Cracks and joints
Saw cuts, construction joints and cracks will usually reflect through a finish if they are not treated. Movement joints in the slab generally need to carry through the finish, while other cracks and joints are filled or treated according to the flooring system.
What can be settled early
- Confirm the finish manufacturer's moisture, flatness and preparation requirements before the slab is poured.
- Allow time in the program for drying and testing, not just laying.
- Agree who is responsible for testing, preparation and levelling.
- Record test results by area before finishes start.
A floor finish is only as good as the slab it sits on.
This article is general information only. It is not engineering, design, legal or other professional advice, and it does not take into account the requirements of any particular project. Requirements vary between projects and between Queensland, New South Wales and other jurisdictions. Always refer to the project documentation, the relevant codes and standards, manufacturers' tested system details and suitably qualified consultants. Echo Construction Group Pty Ltd accepts no liability for any loss arising from reliance on this information.