Before the floor finish goes down: slab preparation on commercial projects

When a commercial floor finish fails, the finish is usually blamed first. More often, the cause is the slab underneath. Moisture, flatness and surface condition all decide whether vinyl, carpet tiles, epoxy, timber or tiles will perform as intended.

Moisture in the slab

New concrete releases moisture for a long time as it dries. If a finish or adhesive is laid before the slab is dry enough, that moisture can cause bubbling, lifting, adhesive breakdown and odours. Each flooring manufacturer sets its own moisture limits and test methods, and those limits decide when the finish can go down.

  • Is moisture testing included in the program, using the method the finish manufacturer requires?
  • Was a vapour barrier specified and installed under the slab?
  • If the slab is too wet, is a moisture mitigation system allowed for in time and cost?

Flatness and level

Thin finishes show every hollow and ridge. The specified flatness and level tolerances for the slab should match what the finish needs. Where they do not, grinding or levelling compounds are needed, and both take time.

Surface condition

Curing compounds, laitance, paint, plaster and other contaminants can stop adhesives and coatings from bonding. Surfaces are normally ground or blasted, cleaned and primed to suit the finish system.

Cracks and joints

Saw cuts, construction joints and cracks will usually reflect through a finish if they are not treated. Movement joints in the slab generally need to carry through the finish, while other cracks and joints are filled or treated according to the flooring system.

What can be settled early

  • Confirm the finish manufacturer's moisture, flatness and preparation requirements before the slab is poured.
  • Allow time in the program for drying and testing, not just laying.
  • Agree who is responsible for testing, preparation and levelling.
  • Record test results by area before finishes start.

A floor finish is only as good as the slab it sits on.

This article is general information only. It is not engineering, design, legal or other professional advice, and it does not take into account the requirements of any particular project. Requirements vary between projects and between Queensland, New South Wales and other jurisdictions. Always refer to the project documentation, the relevant codes and standards, manufacturers' tested system details and suitably qualified consultants. Echo Construction Group Pty Ltd accepts no liability for any loss arising from reliance on this information.

Let's talk
→

Echo Construction Group

Queensland
Sunshine Coast
Brisbane
Gold Coast
‍
New South Wales
Northern NSW

Email

Email us

Phone

+61 420 230 576

Explore

Services
Sectors
About Us
Safety & Quality
Work With Us
Careers
Contact

Social

LinkedIn
Instagram
©2026 Echo Construction Group Pty Ltd
QBCC 15599063 · NSW 494574C
ABN 17 693 563 638
Privacy & Terms
WHS Policy
Echo Construction Group acknowledges the Traditional Custodians of the lands, waters and skies on which we live and work across Queensland and New South Wales. We recognise their continuing connection to Country, culture and community, and pay our respects to Elders past and present. We extend that respect to all Aboriginal and Torres Strait Islander peoples, and are committed to working respectfully on Country on every project we deliver.