Subcontractor prequalification: what head contractors should check on safety and quality
Prequalification is where a head contractor decides whether a subcontractor can be trusted with a package, often before price is even considered. On safety and quality, it is easy to collect documents and harder to tell whether they reflect how the work will actually be run on site.
Safety systems that match the work
In Queensland and New South Wales, high risk construction work needs a Safe Work Method Statement before it starts. A useful SWMS is specific to the task, the site and the hazards involved. A generic document that could apply to any job says little about how a crew will manage the risks on yours.
- Are SWMS prepared for the actual tasks in the package, or copied from a template?
- Who reviews them, and how are they communicated to the people doing the work?
- How are changes to the work or the site reflected in the SWMS?
People, inductions and licences
Everyone carrying out construction work needs general construction induction training, and some tasks need a specific high risk work licence. The question is not only whether the subcontractor holds these records, but whether they cover every person on site, including the subcontractor's own subcontractors and labour hire.
Quality that can be checked
Quality is easier to manage when it is planned in advance and recorded as the work progresses. Inspection and test plans, hold points and photo records give the head contractor a way to confirm work before it is covered up, rather than finding problems after the next trade has started.
- Does the subcontractor use inspection and test plans for the package?
- Which hold points will be offered for inspection before close-up?
- How are defects recorded, assigned and closed out?
Insurance and compliance
Current certificates of currency for public liability and workers compensation, and the right licences for the work and the state, are baseline checks. They are most useful when they are confirmed against the scope of the package, not just collected.
What documents cannot show
A prequalification pack shows what a subcontractor says it does. Site performance shows what it actually does. Pre-start meetings, early inspections and the first few weeks on site are the best test of whether the systems on paper are the systems in use.
A short conversation at prequalification about how SWMS, inspections and defects are handled on site often reveals more than the documents themselves.
This article is general information only. It is not engineering, design, legal or other professional advice, and it does not take into account the requirements of any particular project. Requirements vary between projects and between Queensland, New South Wales and other jurisdictions. Always refer to the project documentation, the relevant codes and standards, manufacturers' tested system details and suitably qualified consultants. Echo Construction Group Pty Ltd accepts no liability for any loss arising from reliance on this information.