Insights
Notes from Echo Construction Group on the issues that shape commercial trade packages: program, scope, risk and durability.
Supply and install or labour only: what changes for the head contractor
Supply and install or labour only? How the choice shifts material, program and defect risk between the head contractor and the carpentry or linings subcontractor.
Concrete cancer in coastal commercial buildings: what asset owners should look for
What concrete cancer is, why coastal commercial buildings are more exposed, the early signs asset owners can look for, and why early assessment matters.
Scope gaps between trade packages: where commercial projects lose time and money
Scope gaps between trade packages are a common source of variations and delay on commercial projects. Where they appear and how head contractors can close them early.
Subcontractor prequalification: what head contractors should check on safety and quality
What head contractors should check in a subcontractor's safety and quality systems at prequalification, and why the documents alone are not enough.
Core-filled blockwork: what has to be checked before the grout goes in
Core-filled blockwork can only be checked properly before it is grouted. What head contractors should confirm at the hold point, and why it matters later.
Before the floor finish goes down: slab preparation on commercial projects
Most commercial floor finish failures start with the slab underneath. Moisture, flatness and surface preparation to settle before the finish goes down.
Building near the coast: the details that corrode first
Salt air finds the weak points in coastal commercial buildings. The fixings, metals and details that tend to corrode first, and what to check early.
Buildability reviews: what an early look at the drawings can save
An early buildability review can find clashes, gaps and impractical details before they are priced or built. What it covers and when it is most useful.